Please use this identifier to cite or link to this item:
https://doi.org/10.21256/zhaw-30440
Publication type: | Conference paper |
Type of review: | Peer review (publication) |
Title: | A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times |
Authors: | Halman, Nir Sedding, Helmut A. |
et. al: | No |
DOI: | 10.21256/zhaw-30440 |
Proceedings: | Proceedings of the 19th International Workshop on Project Management and Scheduling |
Conference details: | 19th International Workshop on Project Management and Scheduling (PMS), Bern, Switzerland, 2-5 April 2024 |
Issue Date: | 2-Apr-2024 |
Publisher / Ed. Institution: | University of Bern |
Language: | English |
Subjects: | Time-dependent scheduling; FPTAS; K-approximation sets and functions; Monotone dynamic programming |
Subject (DDC): | 005: Computer programming, programs and data 658.5: Production management |
URI: | https://digitalcollection.zhaw.ch/handle/11475/30440 |
Fulltext version: | Submitted version |
License (according to publishing contract): | Not specified |
Departement: | School of Engineering |
Organisational Unit: | Institute of Data Analysis and Process Design (IDP) |
Appears in collections: | Publikationen School of Engineering |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
2024_Halman-Sedding_Faster-FPTAS-for-makespan-minimization_PMS2024.pdf | Submitted Version | 115.68 kB | Adobe PDF | View/Open |
Show full item record
Halman, N., & Sedding, H. A. (2024, April 2). A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times. Proceedings of the 19th International Workshop on Project Management and Scheduling. https://doi.org/10.21256/zhaw-30440
Halman, N. and Sedding, H.A. (2024) ‘A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times’, in Proceedings of the 19th International Workshop on Project Management and Scheduling. University of Bern. Available at: https://doi.org/10.21256/zhaw-30440.
N. Halman and H. A. Sedding, “A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times,” in Proceedings of the 19th International Workshop on Project Management and Scheduling, Apr. 2024. doi: 10.21256/zhaw-30440.
HALMAN, Nir und Helmut A. SEDDING, 2024. A faster FPTAS for makespan minimization with time-dependent agreeable V-shaped processing times. In: Proceedings of the 19th International Workshop on Project Management and Scheduling. Conference paper. University of Bern. 2 April 2024
Halman, Nir, and Helmut A. Sedding. 2024. “A Faster FPTAS for Makespan Minimization with Time-Dependent Agreeable V-Shaped Processing Times.” Conference paper. In Proceedings of the 19th International Workshop on Project Management and Scheduling. University of Bern. https://doi.org/10.21256/zhaw-30440.
Halman, Nir, and Helmut A. Sedding. “A Faster FPTAS for Makespan Minimization with Time-Dependent Agreeable V-Shaped Processing Times.” Proceedings of the 19th International Workshop on Project Management and Scheduling, University of Bern, 2024, https://doi.org/10.21256/zhaw-30440.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.